Dates (from to)
Jan 2011 to Dec 2011
Name and address of employer HCC Mumbai India Posting in Sainj Shimla Himachal Pradesh, Kakkrapara Surat Gujarat
Type of business or sector Power Plant Construction Hydropower and Nuclear
Occupation or position held Sr. Manager Contracts and QSS
Main activities an responsibilities
Quantity Survey, Contract, Estimation, cost control, tender and proposals, survey and quantity survey
works professional for companies across diverse industries. Sub Contract Management. Quality checking.
Survey Works on Total Station. Coordinate Marking.
Power Plant Construction (Hydro , Thermal Base, Nuclear)
Dates (from to) Oct2009 - Dec 2010
Name and address of employer Todini Saini Merger with Dana Group Libya (Africa and Europe) Georgia Italian Co.
Type of business or sector CONSTRUCTION OF ROAD,TUNNELS,VILLAS.
Occupation or position held Quantity Surveyor responsible for Billing and Claims
Main activities
Site Supervision. Sub Contract development. Claims and Bills.
Housing Project; Libyan Co. Road and Tunnels Italian Merger
Villa Project of 52 Villas and 3 VIP villas for Dana group at Libya at TUBRUK Libya.
Major Road 19 km on rain soil cum Tunnels 2 Nos in Georgia Europe as Joint Venture Partner
Road Project in Georgia Europe and Remote Area in India and Georgia total 150 Kms of Road with
drainage, culverts, bridge, canals under and over constructions with layouts of border.
Dates (from to) Feb09 - May 2009
Name and address of employer HBK QATAR Nazma Market 1st Floor Doha Qatar
Type of business or sector CONSTRUCTION OF HIGH RISE BUILDING RESIDENTIAL AND MALL
Occupation or position held Quantity Surveyor
Main activities
High Rise Construction AAYAAN Tower. Mall cum Residential.
Building Projects for 66 stories Building in Villas in Libya, Various Malls, High and Low Rise Buildings,
Exclusive Construction. Variation in Drawings. Make WPR,MPR and Estimate.
66 Stories Multistory High Rise Housing Building at West Bay Doha Qatar.
Planning. Estimation. Quantity Survey. Sub Contracts Management.
Date: Feb2008 Feb 2009
Employer:
METRO RAIL AND GAMES
VILLAGE
Ahluwalia Contracting India Delhi NCR & Kalindee Rail Nirman Nigam Limited Gurgaon India
Position: Manager Planning & Dy Manager Projects (Working for 2 companies at same time)
Work: Responsible for Running the project. Reporting to Management.
Common Wealth Games Project - making games village near Akshadham Temple Noida and Caparo Convention
Center at Greater Noida. Estimation. Purchase. Sub Contracts Management.
Finished Metro Rail Line Construction from Dilshad Garden Metro Till Shahdra Signal and Railway Networking
including Rail Line laying, Pillar Structure and Laying of Rail. Rail line balancing. View of Normal line for parallel.
Date: Jul 2007 Feb 2008
Employer:
CONSTRUCTION CEMENT
HOLCIM Cement Ambuja Darlaghat Near Shimla Himachal Pradesh
Position: Assistant Manager Project Contract Basis
Work: Construction of Cement Plant at Darlaghat Himachal Pradesh INDIA for Ambuja Cement with Pyrosection,
Grinding Section and Planning responsible for MS Project and Excel based DPR,WPR,MPR. Fully responsible for
Planning and deliverable. Make coordination with Sub Contractors. Reporting to VP.
Date: Dec 2003 Apr 2007
Employer
POWER AND INFRASTRUCTURE
IVRCL Infra Banjara Hills Hyderabad
Position: Infrastructure DY.Manager Projects VARIOUS SITES in INDIA and Shanghai Assignment in CHINA
Work: Power Project for Transmission Line in Yukon province China consisting of 33/11KV transmission line with Sub
Station . Contract related 33/11 KV Transmission line and power responsibilities.Review Cost/Delivery Impact
situations with, schedule risk analysis. Ensure collation of project costs and revenues, prepare cash-flow and
payment reports and detection of early warning signals for delays and overruns. Monitor actual vs. schedule
progress, forecasting, trend analysis, resource planning during project implementation.Critical Path Analysis and
PERT. Supply Chain with Project Coordination. Transmission transformer set up. Power line set up. Setting up of
Civil works in Sub Station and construction work. Civil Execution with Electro Mech coordination.
Date: July 2000 Sep 2003
Employer:
CONSTRUCTION MANUFACTURE
P.N. Safetech Lucknow India
Position: Works Manager Fully responsible to running of Factory involved in Construction Mfg.
Work: Import and Exports. L/C. Supply Chain Management. Providing Project Control support to Proposals & Projects,
Planning, scheduling, monitoring and control of the project on a continuous basis through work schedules,
progress measurement and reporting systems Lead project controls team on the most complex and highest risk
projects (Karam Brand Helmet and Geotechnical).
Date: Aug 1997 May 2000
Employer
LOGISTICS AND TEXTILE
Obeetee Ltd. Gopigunj Bhadohi Banaras India
Position: Asst. Manager Godowns
Work: Construction of Scaffolding structures. Special Import. Export Coordination. Productivity Increase.
Managing Godown for cement. Cement Godown Construction. Quality Checking of Carpet. Fault Prevention.
Carpet Supply and Warehousing Management Oldest in world MNC
Construction of Yarn go downs and cement go downs store house.
It is solemnly declared that as per my belief and knowledge, the above information is correct.
References : Sarang Rane : IT MANAGER HCC: +918894700218 Vijay Gupta : VP Material HCC= +918894700211
Tarun Suta : Professor (Ex Classmate) +919452170890
Note: Last several Job changes have been due to End of Contract. The Job was on Contract Basis.
Er. Rohit Kapoor
A-13723 Reg. no.
My expat journey



Saudi Arabia

India
Activity
rohitkapoor replied to a thread
New rules for iqama profession change by Jiggs500
Can anyone please outline the steps involved in changing profession from technician to engineer? What is the involvement of SCE? Recent experience would be really helpful since there have been some changes. Regards, J
sure what is in 2014? Read More