天美麻豆

Menu
天美麻豆
Search
Magazine
Search

Technical Manager

I am looking for work in Tanzania, I have been in Dar for 7 years and would like to return.

Please contact me.
See also
Hi faniem and welcome to 天美麻豆!

A little intro might be appreciated.;)

I invite you to post an advert in the section Jobs in Dar es Salaam, it may be helpful.

Harmonie.
Technical Manager

STEPHANUS LE ROUX MALAN

Tel: 078 238 4524 聳 082 602 4464
Fax: None
E-Mail: faniem@hotmail.com

1.0                          Personal Information 
                                   South African
                                   ID:  660512 5111 088.
                                   Date of Birth: 12 May 1966
                                   Married
                   Two children
                                   Military training completed
                                   Hobbies: Golf, fishing, reading and sports
                           
2.0                             Education
聲    Business Management Diploma (G.M.I.T.).
Personnel effectiveness (Distinction)
Accounting and finance
Managing people
Strategic Management
International module
Marketing (Distinction)

聲    N.T.C.4 Electrical / Mechanical Engineering
聲    N.T.C.5 聳 Two Subjects: Electrical / Mechanical Engineering (studying at In-tek to complete my National Diploma Electrical and Mechanical Engineering).
聲    Electrical Trade Test Certificate 聳 Distinction (Electrician).
聲    Gas Testing Certificate.(Anglo America)
聲    Chambers of Mines 聳 Maintenance of flameproof materials. (Anglo America)
聲    Time Management Certificate.( Sun International)
聲    Principles of Management Program. .( Sun International)
聲    Appraising Skills. .( Sun International)
聲    Interview & Selection. .( Sun International)
聲    Industrial Relations Certificate. .( Sun International)
聲    Target & Selection. .( Sun International)
聲    Financial for Non-financial Managers. .( Sun International)
聲    Module in World Class winners.
聲    Fire and Safety Training Tanzania (Hotel Sea Cliff)
聲    Yanmar Engine training ( Construction Equipment Africa)
聲    Rectifier training , Emmerson and ASM.( Grintek)
聲    Voltage Stabilizer. (Grintek).
聲    Health and Safety (Ochact). (WSP)
聲    Standard 10 Wag pos High School.
聲    Compass readiness central main frame(Policies and procudures)



3.0                                     Work experience 

Nov 2011-Present         Facilities Manager
                                     Old Mutual Property LTD.  .
                             Main function 
聲    Facilities Manage the industrial, offices and retail portfolio (250 tenants, 85 buildings and Parks)
聲    Assisting with the FM on the Pretoria retail portfolio.
聲    Manage Budgets, capex and forecasts.
聲    Liaise with tenants on a daily basis.
聲    Tenant reinstatements of sites.
聲    Project Manager projects up to the value of R 60,000,000.
聲    Facilities Management consist of; security, landscaping, soft services and hard services.
聲    Motivations for funds allocated for new developed buildings.
聲    Electrical and mechanical audit inspections.
聲    Health and safety 16(2) appointment contractors.



Contract 1 year
Aug 2010-Oct 2011         Technical Manager/Projects Mines (contract) in Guinea, Africa
                                       Kwikspace ltd.
                                       Main function
聲    Installation and commissioning of plant and equipment for new mine camps  e.g .generators 1500KVA, mains transfer switches, electrical reticulation, laundry equipment, kitchen equipment, water treatment plants, air-conditioning, reefer units, sewage treatment plants and water treatment plants.16(2) appointment HSE.
聲    Introducing policies and procedures for disciplines in all technical fields.
聲    Maintenance training for the operation of all plants to the client.
聲    Setting up S.L.A between sub-contractors and Kwikspace Ltd and reviewing contracts.
聲    Responsible for shipping, planning and assets before final handover to client.
聲    Pre-testing of all plant and equipment.
聲    Budget controls during the project. Total budget R 10,000,000.
                         
   



Nov 2008-June 2010         ESS, Compass Group LTD.
                                         Facilities Manager
                                         Siemens Park Midrand, N1 Business Park and Kya Sands       
                                          Main function
聲    Responsible for  Facilities Management (Hard services, Soft services, Wet services, HVAC and Project Management)
聲    Monthly, quarterly and annual Operations and Financial reports.
聲    Financial maintenance budget up to +R24, 000,000 per annum. (Cost savings initiatives).
聲    Environmental audits reports.(Waste Management, emissions and noise)
聲    Staff complements, twenty staff members excluding contractors.
聲    Space planning and projects.
聲    Office moves and asset Management
聲    Plant and Equipment Life cycle replacement project. Total R10,000,000 ( Chiller systems and cold rooms).
聲    Replacement of new chiller systems, because of newer technology achieved a 30 % total power consumption saving.
聲    Energy saving initiatives savings up to 15 % on power.
聲    Tender documentation and process.
聲    Responsible for the Service level agreements between Company and sub-contractors.
                                                                     
                                         Clients
聲    Siemens Park
聲    N1 Business park Siemens
聲    Kya Sands Siemens
   

Feb 2006-Nov 2008       WSP Group of Companies (Gretev Ltd.)
                                     Facilities Manager
                                     Johannesburg Head Office
      Main function
聲    Responsible for Electrical, Mechanical, Wet services, HVAC and Health and Safety asset inspections..
聲    Finalizing audit reports.
聲    Writing  proposals for Facilities Management to the client ( Pick it up and Estia Real Estate in Tanzania) within conjunction with the Facilities Directors
聲    Gap analysis on the above disciplines.
聲    Follow up on audits findings and ensure that audit reports are generated.
聲    Budget proposals for projects Capital expenditure R 5,000,000.   
                                                             
                                      Clients
聲    Government buildings in Johannesburg
聲    Government Hospitals In Johannesburg
聲    Banks in Nigeria ( Intercontinental)
聲    Banks in Johannesburg (ABSA)
聲    Retail : Shoprite
聲    Checkers Hyper
   
                                  WSP Group of Companies (Gretev Ltd.)
                                             Facilities Manager
                                     University of Limpopo
                                      Main function
聲    Responsible for maintaining the Academic and Residential facilities.
聲    Equipment maintained: Chiller plants, Air-conditioning, 1000KVA mini substations, 13 substations, water supply, sewage, Residential and Academic buildings, electrical, mechanical and lifts x 20.
聲    Responsible for the Gretev Ltd office staff on site, which consist of a helpdesk operator, call centre operator, co-coordinator, financial officer and four technical inspectors.
聲    Project Management. ANC conference R 101,000,000(projects).
聲    Responsible for twenty-five University maintenance staff members.
聲    Responsible for Health and Safety (16)2 appointment.
聲    Responsible for maintenance budget forecast up to R80, 000,000.00 PA.
聲    Capital expenditure Projects and Asset Management
聲    Submitting of monthly, quarterly and annual financial and operations reports to head office (WSP).

   New systems/Events
聲    Electrical energy saving projects with a 10 % cost reduction.
聲    Riving of existing water reservoir in-conjunction with the municipality and Lepele Water Authorities. (Cost saving of R350, 000.00 per month.)
聲    Implementation of systems to decrease the water bill of the University.
聲    Project planning and Implementation of the ANC 52nd conference for 5000 delicates.
聲    Implementation more efficient project planning systems.
聲    Initiating new operating systems with sub-contractors.
聲    Initiating meetings, to better communication between client and sub-contractor.
聲    Introduction of energy management power monitoring at Medunsa University in conjunction with H.Q. WSP Group of Companies.
聲    Future projects 2007. Installation of Energy Management systems to improve response times on all Heat pump stations, generator failures and Ups systems.
聲    Preparing of all service level agreements of existing and new sub-contractors.


Reason for leaving:
Compass Group offered a better package


July 2001-Feb 2006     Siemens Tanzania   
                                National Power Manager, Tanzania Vodacom
                                   
                                    Main function
聲    To ensure Vodacom power sites generators run to their optimum efficiency without interruptions.
聲    Introducing preventative maintenance programs via sub-contractors.
聲    Responsible for the sub-contractors serving Vodacom.(Two companies 300 employees)
聲    Responsible for all air-conditioning units on 700 sites in Tanzania.
聲    Responsible for the packet air-conditioning units in the switch and IN platform buildings.
聲    Responsible for power and diesel, for Vodacom cellular via Siemens.
聲    Responsible for Asset Management.
聲    Budgets controls monthly-yearly budgets (USD 250,000 annualy)
聲    Capital expenditure.
聲    Monthly audit inspections.
聲    Feedback to Vodacom South Africa on VTL internal audit findings.
聲    Introduction of Environmental Management System for VTL Tanzania act 14000 SAB standards on noise emissions etc. according to the 聯World Bank Standards聰
聲    Introduction of Occupational Health and Safety via Vodacom South Africa
聲    Representing Siemens in Vodacom Health and Safety meetings

                              New systems/Events
聲    Working on the Vodacom call centre to maximize efficiency on hours run and fuel consumptions
聲    Installing prime second generator at main switch (Vodacom) 1400 KVA Cat.
聲    Installations of 2 x Volvo gensets at IN platform building.
聲    Installations of 2 x 100 KVA UPS systems.
聲    Project planning on all electrical switch gears and installations at the new IN building.
聲    Project planning on new Core business equipment relocating of all equipment and power requirements.
聲    Initiating new systems with sub-contractors.
聲    Initiating meetings to better communication between client and sub-contractor.
聲    Introduction and implementation of all the Power Department policies and procedures.
聲    
                                    Reason for leaving:
Returned to South Africa after contract period.



June 1999-June 2001    Hotel Sea Cliff, Dar es Salaam, Tanzania
Maintenance Manager

Main Function
聲    Preventive maintenance schedules are carried out.
聲    Ensure that company assets do not deteriorate.
聲    Managing proper and adequate control over staff at all times.
聲    Introducing Industrial relation systems and policies.
聲    Eliminate down time to plant and equipment
聲    Stock control processes for material are in place.
聲      Placing of orders on a weekly basis to maintain the hotel to its 100%   efficiency.
聲    Submitting month end reports.
聲    Submitting budgets and forecasts monthly and annually.
聲    Responsible for fire, loss and safety.
聲    Responsible for staff transport at the Hotel.
聲    Responsible for general Housekeeping back of house areas.
聲    Responsible for Security of the Hotel and Casino (Outsourced).
聲    Annual maintenance budget USD 100,000
聲    Refurbishment projects hotel and casino budget USD 500,000

New systems/procedures/changes/events
聲    Restructuring of all maintenance staff
聲    Restructuring of all canteen staff.
聲    Set up procedures in the Maintenance Department.
聲    Introduced a Fire and Safety Program via the Head of Fire and Safety of Tanzania.
聲    Setting up of month end reports, budgets, forecasts, preventive maintenance programs, monthly rosters and procedures.
聲    Changes of staff access in liaison with the General Manager.
聲    Purchased a 150KVA generator for the new Casino and Bowling Ally.
聲    Organized, planned and controlled all additions to M-NET:聰 Face of Africa聰 e.g. Stages, electricity, marquee and maintenance operations.
聲    Installation of a 2000lt. LPG gas tank at one of sea Cliff聮s major food outlets.
聲    Introduced Logbooks, day-to-day monitoring and cleanliness at all plant rooms.
聲    Upgrading of 11KV switch gear (replacement).
聲    Introducing of RS. Components stock and prices.
聲    Revamping of executive rooms into single rooms.
聲    Installation of bowling alley machinery.
聲    Proposals for a Desalination plant (reverse osmosis).
聲    Proposals for energy management system (Load shedding).
聲    Proposal/installation 275 KVA Generator (Chiller Plant).

Reason for leaving:
Completed contract period


Jan1991-June 1999    Sun International 聯Morula Sun聰
                                  Deputy Maintenance Manager
  Main Function
聲    Acting Maintenance Manager in the absent of the Maintenance Manager.
聲    Assist the Maintenance Manager to efficiently manage planning, manpower
Deployment, organization, operation and control within the   department.
聲    Ensuring proper maintenance of plant and assets are consistent with agreed policies.
聲    The successful application of preventive maintenance programs in order to maximize equipment and asset useful life.
聲    Ensure the preventive maintenance schedules are carried out.
聲     Liaise with the Maintenance Manager with regards 聯day-to-day聰 maintenance.
聲     Ensure that the facilities comply with all national and local regulations as lay down by the relevant authority.
聲     Do regular inspections to ensure that all safety aspects are maintained in line with regulations.
聲     Ensure that all safety procedures are strictly followed.
聲     Ensure that all guest facilities are maintained at the highest possible standard.
聲    Managing of 30 staff members, which consist of Supervisors, Aides, Electrical handymen, Plumber handymen, Carpenter handymen, General handymen, and Kitchen handymen?
聲    Responsible for breakdowns and servicing of chiller plants.
聲    Monitoring and statistics of heater, electricity, diesel and LP gas.
聲    Day to day monitoring of K.V.A and K.W. readings.
聲    Attending Executive Management meetings, etc.
聲    Financial reports 聳 Monthly and Annually.


                             Sun International, Morula Sun
                      Slots Wrapping Technician

Main Function

聲     Repair all coin wrapping machines.
聲     Repair and programming of all Mikhons equipment, coin and note counters.
聲     Faultfinding, repair and servicing of Universal, Baileys slot machines.
聲     Faultfinding on all MPU and mechanical hoppers and illumination
聲     Copying EPROM聮s.

Reason for leaving:
Relocated to Tanzania



Dec 1987-Jan 1991   Anglo American (Goede  Hope Mine)       
Electrician

Main Job Functions                                                                                                                                                                                                                                                                                                                                                                                                                                       

聲    In charge of two sections underground
聲    Responsible for Yorkshire switches 11Kv switchgear.
聲    Responsible for 11Kv./ 950v TRF and sub-stations.
聲    Responsible for 950v. Switchgear and 110v. Switchgear.
聲    Conveyor control systems alarms, stop/start units.
聲    DC Drive motors, a/c drives motors.
聲    All underground electrical moving machine loaders, shuttle cars, coal site crushers, drill faultfinding.
聲    Intercom systems.
聲    Preventive maintenance.
聲    Daily reports and orders.
聲    Standby for breakdowns.

     

        4.0                 Referees:

Morula Sun (Sun International):
Maintenance Manager:  Barry Chappell Tel: 012 799 0000 RSA.
Sea Cliff Hotel:
MD : Keven Stander Tel: (09255)2 600 385 or 0742 333 473
Siemens Tanzania LTD:
                             Johan Hattingh (Network Manager) Tel: 0827802370 RSA
                              WSP Group of Companies
                              Trevor Pierce- Jones (Facilities Director) Tel: 0826540794
                              Rowland Gurnell (Director of Operations) Tel:  0827897494
                              Compass Group
                             Andrew Harris (MD ESS Compass Group) Tel: 0824902204 
                              Kwikspace Ltd.
Hello faniem.

Can you please post your cv in the jobs in Dar es Salaam section?

Thank you,
础耻谤茅濒颈别

Further reading